Installation of the waverail rail system

Professional installation by experts

Prior to placing the order, our foundation builders check the specific ground conditions. As the case may be, this may include not only the examination of the static suitability of the base plate but also the creation of a height profile. Based on this, we work with the costumer to determine the track course of the waverail® rail system.

Assembly is carried out on the basis of the drawings for the mounting devices in the following order:

  • The track is drawn and cut in the screed according to the HORSTKEMPER drawing (width and depth). The rail system is initially assembled overlapped next to the slots.
  • The mounting devices are mounted on the rails and the track aligned [The minimum height tolerance is +/- 1.0 mm over a length of 5000 mm].
  • The rails are bonded with a waterproof adhesive tape for protection against dirt.
  • A cast is prepared with a non-shrinking, rapidly drying mortar.
  • Once the mortar has dried, the mounting devices are dismantled.
  • After removing the adhesive tape, the waverail® is ready for use [Please note the curing time of the mortar before loading].